Elevators: 21st floor a typical example
The elevator entrances were built simply and presented to buyers then Unit Owners in 2009 at turnover. Since then the elevators have been a disaster in a continual process of being made to work as they should have been starting at least since turnover. To accomplish this the elevators entrances on the various shafts have been demolished then restored. The restoration results have been awful. Just look from floor to floor at the rotten work.
PE1 tile removed.
Remember to look at elevator entrances that have not been demolished and restored.
PE2 still being restored. That jutting part of the wood has been cut.
Why were the light fixtures never covered and sealed during work?
I do not need to see the spackling job that will be done on this one since many other examples are on all floors from previous restorations.
This was the result of the Service elevator restoration.
PE3 tile replacement. Just think about what we purchased and what is and may be sold with buyers looking.
Another entrance restoration. Just rotten.
The boards forming the entrances were OK in 2009, why can they not be done correctly now? This rotten restoration job is just a sloppy mess turning the building into a slum. These boards as so many others do not meet each other evenly then cutting at angles takes place. Shoddy construction.