Plan, plan and plan some more

QUESTION: Is Stonewall Central a better name for the property?
UPDATE (click): 2012 Audited Financial Statements
UPDATE (click): 2013 Annual Meeting packet
UPDATE (click): 2013 Special Meeting packet

AUDITED FINANCIAL STATEMENTS ANALYSIS 2009-2012 (click): A CPA analysis of SOHO Central Condominium Corporation's Audited Financial Statements

The Fantasy Vision

Does everyone remember this among the wonderful ads and brochures and how about the salespeople and what they told us. I hear such fantasies continue. So after watching and remembering, cry and then laugh at the truth that is being exposed.









And, if the above is not enough and you need elevated blood pressure, here is the project's brochure.

Many posts are still issues and need to be read once again. At this main hub of postings watch for new posts and updates. Please get involved by spreading the word as to the issues here. We must document all that is taking place. Many documents need retrieval and assistance is needed in getting them scanned and posted.

Monday, November 9, 2015

Elevators: 21st floor a typical example

Elevators: 21st floor a typical example


The elevator entrances were built simply and presented to buyers then Unit Owners in 2009 at turnover.  Since then the elevators have been a disaster in a continual process of being made to work as they should have been starting at least since turnover.  To accomplish this the elevators entrances on the various shafts have been demolished then restored.  The restoration results have been awful.  Just look from floor to floor at the rotten work.

PE1 tile removed.


Remember to look at elevator entrances that have not been demolished and restored.




PE2 still being restored.  That jutting part of the wood has been cut.



Why were the light fixtures never covered and sealed during work?




I do not need to see the spackling job that will be done on this one since many other examples are on all floors from previous restorations.




This was the result of the Service elevator restoration.





PE3 tile replacement.  Just think about what we purchased and what is and may be sold with buyers looking.


Another entrance restoration.  Just rotten.








The boards forming the entrances were OK in 2009, why can they not be done correctly now?  This rotten restoration job is just a sloppy mess turning the building into a slum.  These boards as so many others do not meet each other evenly then cutting at angles takes place.  Shoddy construction.