Plan, plan and plan some more

QUESTION: Is Stonewall Central a better name for the property?
UPDATE (click): 2012 Audited Financial Statements
UPDATE (click): 2013 Annual Meeting packet
UPDATE (click): 2013 Special Meeting packet

AUDITED FINANCIAL STATEMENTS ANALYSIS 2009-2012 (click): A CPA analysis of SOHO Central Condominium Corporation's Audited Financial Statements

The Fantasy Vision

Does everyone remember this among the wonderful ads and brochures and how about the salespeople and what they told us. I hear such fantasies continue. So after watching and remembering, cry and then laugh at the truth that is being exposed.









And, if the above is not enough and you need elevated blood pressure, here is the project's brochure.

Many posts are still issues and need to be read once again. At this main hub of postings watch for new posts and updates. Please get involved by spreading the word as to the issues here. We must document all that is taking place. Many documents need retrieval and assistance is needed in getting them scanned and posted.

Saturday, March 12, 2016

21st Floor Tiles Popping removed


21st Floor Tiles Popping removed at Soho Central Condominium, Mandaluyong, Metro Manila


Elevator lobby area tiles were popping up near where work had been done on the elevators including demolishing the elevators' entrances.

What caused this popping up?  Is it related to the elevator work?  Or, is it related to a structural change or movement of the building that may be taking place?  Think.  This section popped up like a bubble.  What pressure from one or more direction caused this?  The elevators are a mess; is there a relationship?


The elevators have not been functioning properly since during turnover.  The elevators have been in a perpetual state of being fixed.  Is there something beyond just the elevators?  Is there also a problem with the structure of the building?  What is taking place?

Besides the bubble of tiles that was formed, there are tiles elsewhere that make noise when stepped on.  Why?  See the previous post using the link below.  See the instruction on placing tiles and preparing the mortar.  None of the tiles removed showed mortar with the grooves.  Have all the tiles been placed without the correct procedure?